New Builds

new build construction, new build construction costs, new build construction stages, new build construction process, new build construction loans, new build construction companies, new build construction methods, new build construction vat, new build construction vessels, new build construction timeline, my building services ltd

Your project, your vision. It is our job to transalate your architects drawing to an actual building with perfect symmetry. Built with high quality craftsmanship backed by professional management.

My Building Services Ltd prides itself on delivering projects on time and within budget. We believe our success to date is due to our single minded approach to excellence and placing the client at the centre of everything we do. As a result of this focus we have developed client and consultant repeat business with an enviable reputation for delivering high quality new build and refurbishment projects valued between £100,000 – £4,000,000.

Whether it's a modern and contemporary build or a more traditional build we have the broad range of skills required.

New Build Construction Timeline

Week 1

  • Site preparation,  excavation and staking

Weeks 2-5

  • Footings, foundation and framing.

Weeks 6-8

  • Heating and cooling system are installed.
  • Plumbing lines are run and the electrical system is put in place.
  • Insulation is put up, and drywall covers interior walls and ceilings.

Weeks 9-11

  • Flooring is installed.

Week 12

  • Installation of faucets, light fixtures, plugs and appliances.

Weeks 13-14

  • Thorough tidy up and small details completed.
  • Final “walk through” with client.
Book Your Free New Build Quotation Today

Suggested Articles

So You Want to Build: 7 Steps to Create a New Home

A Step-by-Step Guide to the Home Building Process

A Home Construction Timeline to Keep You Sane